- At Mud Lake, gold mineralization is concentrated in quartz veins associated with a shear zone, traced for 6 km across the property.
- Drilling highlights include 13.9 g/t Au over 1.0 m within a broader section of 3.4 g/t Au over 6.1 m.
- 42 diamond drill holes completed in 2007 / 2008 totaling 3,045 m.
- Surface glacial till sampling completed in 2018 and 2019 returned several samples with significantly high gold grain counts.

MUD LAKE Drilling and Glacial Till Sampling Map Note: Caprock Mining Corp. was formerly known as Blingold Corporation
MUD LAKE Drilling Results Summary